In this project, 25024 cubic meters of concrete have been poured so far. The location of Behkish Marina project in the Persian Gulf, which has one of the saltiest waters in the world, makes the concrete used in this location vulnerable to attack by sulfate and chloride ions. Therefore, the design of concrete mix is of utmost importance, which improves the durability and stability of concrete and prevents the effects of chemical attacks on it. In this project, so far (by the end of November 6), 25024 cubic meters of concrete have been poured in 184 sessions through 3091 mixers. The consumed concrete has a compressive strength grade of C40 (cylindrical) and a cement content of 450 kilograms per square meter, along with self-compacting scc-type super-plasticizer and micro-silica gel, along with ground and air pumps from Kish Concrete Company. The results of concrete compressive strength tests indicate the high quality of this material. And now the concrete structure of the tower is being implemented by one of the most reliable and well-known contractors of the island, named Meraj Gostar Noor Kish Company.